Secure Holding Suite ED at Melrose Wakefield Hospital • Melrose, MA

Project Details

PROJECT CONTACT:
JUSTIN FERBERT
781-979-3292
JFERBERT@HALLMARKHEALTH.ORG

Name of Contracting Activity that awarded contract: Hallmark Health System
Contract Number: 12-1191
Period of Performance: 06/2012-01/2013
Contract Type: Commercial
Contract Value: $ 278,352.00
Final Contract Price: $ 309,377.00

List of Major Subcontractors:
MEC Electrical
Deyo Construction
P.J. Dionne Company

Brief History of Work:
• This project included demolition of approximately 2,000 sf, 100% all demolition materials were redirected for beneficial reuse, recycling and zero-landfill wastes were generated throughout the entire project. Interior system installations included all interior CSITM divisions including metal studded sound-proof walls, metal framing, rough and finish carpentry, thermal and moisture protection. All windows and doors are FE/BR-rated